Skip to content
S-FORM

World leader in aluminium formwork

Cast-in-place concrete walls, with speed and precision.

The company holding the most formwork patents in the world. Korean technology and in-house S-FORM manufacturing since 1985.

Videos

Formwork in motion

Short recordings of the system on site, published by the S-FORM team. Tap to watch full screen.

See all videos

Want to see the formwork in action? Watch the job-site footage.

Watch now

Authority

World leader in aluminium formwork since 1985.

The company holding more formwork system patents than any other in the world. A manufacturer, not a reseller: in the Korean factories, the process runs from casting the aluminium billet to robotic welding inside S-FORM itself.

1985
Founded in South Korea
70%
Market share in South Korea

The highest panel reuse rate in the market

Exclusive S-FORM construction technology

Leader in formwork research and development

Most patents in the market

In-house manufacturing

From billet casting to shipping.

Five stages of S-FORM's manufacturing process, from billet casting to shipping.

01

Billet casting

Billet casting

Aluminium is melted in S-FORM's own reverberatory furnaces to form the billet every profile starts from.

02

Aluminium profile extrusion at an S-FORM factory

Profile extrusion

The billet runs through the plant's extrusion presses and becomes the profiles that make up each panel's structure.

03

Machining and assembly

Machining and assembly

Profiles are machined and assembled into panels according to the customised design of each project.

04

Robotic welding — Illustrative image

Robotic welding

Components are joined by robotic welding and friction stir welding (FSW) on the S-FORM production line.

05

Pre-operation inspection

Pre-operation inspection

Every unit is classified by barcode and inspected before it is released for shipping.

Global presence

7 factories of our own. Projects across the globe.

Some of the units: Anseong, Jincheon, Sihwa and Gwanghyewon in South Korea, Sendayan in Malaysia, and Chakan in India. In-house manufacturing at all seven, with a stable raw-material supply and strict quality control.

S-FORM projects in several countries: South Korea, Brazil, Malaysia, India, Singapore, Vietnam, Thailand and Mongolia.

Some of the factories

Headquarters and offices

Brazil

S-FORM plant in Anseong, South Korea
AnseongSouth Korea
S-FORM plant in Jincheon, South Korea
JincheonSouth Korea
S-FORM plant in Sihwa, South Korea
SihwaSouth Korea
S-FORM plant in Gwanghyewon, South Korea
GwanghyewonSouth Korea
S-FORM plant in Sendayan, Malaysia
SendayanMalaysia
S-FORM plant in Chakan, India
ChakanIndia

Products

A system for every type of project.

Three integrated product lines, with in-house S-FORM manufacturing.

Job-site footage from the S-FORM archive

Flagship line

Aluminium Formwork

Typical floor in a cycle of up to 4 days. Our flagship line.

View system

Job-site footage from the S-FORM archive

Gang Forms and Climbing Systems

Vertical precision in high-rise buildings, with ACS, PCS, GCS and SCS for tall structures.

View system

Job-site footage from the S-FORM archive

Civil Construction

Bridges, tunnels and heavy shoring.

View system

Projects in Brazil

Projects already standing in Brazil.

Major Brazilian builders build with S-FORM formwork.

Sumaré project, by Queiroz Galvão, built with S-FORM aluminium formwork
SumaréQueiroz Galvão
Candeias Village project, by Queiroz Galvão, built with S-FORM aluminium formwork
Candeias VillageQueiroz Galvão
Palm Village project, by Queiroz Galvão, built with S-FORM aluminium formwork
Palm VillageQueiroz Galvão
José Euclides project, by Direcional Engenharia, built with S-FORM aluminium formwork
José EuclidesDirecional Engenharia
Alameda project, by Direcional Engenharia, built with S-FORM aluminium formwork
AlamedaDirecional Engenharia
Cidade Jardim project, by Direcional Engenharia, built with S-FORM aluminium formwork
Cidade JardimDirecional Engenharia
Colônia Juliano Moreira project, by Direcional Engenharia, built with S-FORM aluminium formwork
Colônia Juliano MoreiraDirecional Engenharia
Rio Cangulo project, by EMCCAMP, built with S-FORM aluminium formwork
Rio CanguloEMCCAMP
Curral Novo project, by EMCCAMP, built with S-FORM aluminium formwork
Curral NovoEMCCAMP

Quote

Request a quote for your project.

Send us your project details and S-FORM's sales engineering team will get back to you with a technical assessment.

Typical floor in a cycle of up to 4 days
Formwork precisely customized to your project
In-house manufacturing, from billet casting to robotic welding
Trained supervisors with technical support on site

In a hurry? Call (11) 3392-6169.

Optional
Optional
Optional